Connecting Container #1 – Construction

First Door and Access Openings welded into the Side of the Connecting Container.

Roof Cap over the Joint between the Connecting Container and the Scene Container.
Remaining Door Frames and Access Opening Plug Frames delivered.
All the Doors and Access Panels are welded in.
Exterior View.
Door Installation complete.
Floor Framing and Floor & Wall Insulation.
Wall and Ceiling Framing.
Wall & Ceiling Insulation.
Sheetrock – Ready for Electrical.
Conduit Installed.
Walls Painted.
Ceiling Painted.

Connecting Container #1 is Finished!